OpenAlex 170 works 2 author topics
Works
170 works
-
OpenAlex 83.3%
The use of precast concrete systems offers several advantages such as speedy erection, higher quality, lower project cost, better sustainability, and enhanced occupational health and safety. In spite of these advantages, the share of precast concrete systems in the U.S. building construction market is very low. The fa…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.4%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.4%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 10%
OpenAlex 92.3%
Precast concrete technology is recognized worldwide as offering significant advantages. Despite the advantages they offer, precast concrete building systems’ share in both Turkey and the U.S. is very low, especially when compared to many European countries. Since Turkey is a developing country that is technologically…
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex top 1%
OpenAlex 99.3%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex top 10%
OpenAlex 98.2%
Numerous studies have been conducted by researchers on the delay analysis topic, which is one of the primary areas of scientific study due to the effects of delays on time and cost in construction projects. Following fruitful contributions made by the researchers, it is believed to be extremely important to summarize…
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex top 10%
OpenAlex 98.2%
Numerous studies have been conducted by researchers on the delay analysis topic, which is one of the primary areas of scientific study due to the effects of delays on time and cost in construction projects. Following fruitful contributions made by the researchers, it is believed to be extremely important to summarize…
-
OpenAlex top 10%
OpenAlex 95.7%
No abstract yet.
-
OpenAlex top 1%
OpenAlex 99.9%
After a period characterized by a strong emphasis on the environmental and physical aspects of construction processes, researchers are speeding up efforts to combine environmental performance with economic data. The driver of this movement has been the challenge of establishing a balance between the three main pillars…
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex top 10%
OpenAlex 93.6%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 10%
OpenAlex 98.2%
No abstract yet.
-
Life cycle cost analysis for constant air volume and variable air volume air conditioning systems 2006YÖKSİS SJR Q1 JCR Q2 OpenAlex top 10% OpenAlex 94.6%
No abstract yet.