Skip to content
akaturk Academic measurement

OpenAlex topic

Construction Engineering and Safety

This page lists works and academicians tagged with an OpenAlex topic. It is not a YÖKSİS primary or secondary field.

OpenAlex 347 works 5 author topics

Works

347 works

  1. OpenAlex 88.2%

    Occupational injury and fatality risk analysis was performed on 16 building trades in the study reported herein. The approach was based on defining risk fundamentally as the product of probability (frequency) and severity, and using the risk plane concept to evaluate and rank the trades in terms of nonfatal injury rat…

  2. YÖKSİS SJR Q1 JCR Q3 OpenAlex top 10% OpenAlex 94.5%

    No abstract yet.

  3. YÖKSİS SJR Q1 JCR Q3 OpenAlex top 10% OpenAlex 94.5%

    No abstract yet.

  4. YÖKSİS SJR Q1 JCR Q1 OpenAlex 89.0%

    No abstract yet.

  5. YÖKSİS SJR Q1 JCR Q2 OpenAlex top 10% OpenAlex 94.1%

    No abstract yet.

  6. YÖKSİS SJR Q1 JCR Q1 OpenAlex 89.2%

    No abstract yet.

  7. YÖKSİS SJR Q1 JCR Q3 OpenAlex 24.0%

    No abstract yet.

  8. YÖKSİS SJR Q1 JCR Q3 OpenAlex 24.0%

    No abstract yet.

  9. YÖKSİS OpenAlex top 10% OpenAlex 96.9%

    Labor productivity has a significant impact on time, cost, and quality of a construction project. Especially the competitive environment of the construction industry forces construction companies to increase their labor productivity values in order to keep their positions in the industry. In this respect, identificati…

  10. YÖKSİS OpenAlex top 10% OpenAlex 96.9%

    Labor productivity has a significant impact on time, cost, and quality of a construction project. Especially the competitive environment of the construction industry forces construction companies to increase their labor productivity values in order to keep their positions in the industry. In this respect, identificati…

  11. YÖKSİS SJR Q1 JCR Q1 OpenAlex top 10% OpenAlex 92.7%

    No abstract yet.

  12. YÖKSİS SJR Q2 JCR Q1 OpenAlex 89.3%

    Construction projects generally involve high risk because they are widely based on estimations of future events. Disputes between the project participants, including contractors and subcontractors, are often related to inaccurate projection and inadequate knowledge of the consequences of the risks involved. The aim of…

Academicians

5 academicians