OpenAlex 1,525 works 102 author topics
Works
1,525 works
-
YÖKSİS
SJR Q4
OpenAlex top 10%
OpenAlex 97.1%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.9%
No abstract yet.
-
A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS 1995YÖKSİS SJR Q1 JCR Q1 OpenAlex top 10% OpenAlex 97.1%
This paper exploits the interactions between the machine scheduling and the scheduling of the material handling system in an FMS by addressing them simultaneously. The material transfer between machines is done by a number of identical automated guided vehicles (AGVs) which are not allowed to return to the load/unload…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.4%
There are several situations in a product recovery environment where products may be disassembled for economical and regulatory reasons. The disassembly line is perhaps the most suitable setting for disassembly of large products (consisting of numerous components) as well as small products received in large quantities…
-
OpenAlex top 1%
OpenAlex 100.0%
During the past two decades, there have been increasing interests on permutation flow shop with different types of objective functions such as minimizing the makespan, the weighted mean flow-time etc.The permutation flow shop is formulated as a mixed integer programming and it is classified as NP-Hard problem.Therefor…
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex top 10%
OpenAlex 98.7%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex top 10%
OpenAlex 96.2%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q3
OpenAlex top 10%
OpenAlex 97.9%
As product and material recovery has gained importance, disassembly volumes have increased, justifying construction of disassembly lines similar to assembly lines. Recent research on disassembly lines has focused on complete disassembly. Unlike assembly, the current industry practice involves partial disassembly with…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.4%
The disassembly line balancing (DLB) problem assigns the set of tasks to each workstation for each product to be disassembled and aims at attaining several objectives, such as minimising the number of workstations, ensuring similar idle time at each workstation and removing hazardous parts/highly demanded components a…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.4%
The disassembly line balancing (DLB) problem assigns the set of tasks to each workstation for each product to be disassembled and aims at attaining several objectives, such as minimising the number of workstations, ensuring similar idle time at each workstation and removing hazardous parts/highly demanded components a…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.5%
No abstract yet.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex top 1%
OpenAlex 99.6%
Flow shop scheduling (FSS) problem constitutes a major part of production planning in every manufacturing organization. It aims at determining the optimal sequence of processing jobs on available machines within a given customer order. In this article, a novel biobjective mixed-integer linear programming (MILP) model…
Academicians
102 academicians
- ADİL BAYKASOĞLU 53 author topics
- İBRAHİM KÜÇÜKKOÇ 52 author topics
- MEHMET SELİM AKTÜRK 40 author topics
- ZEYNEL ABİDİN ÇİL 27 author topics
- MERAL AZİZOĞLU 25 author topics
- BİLAL TOKLU 24 author topics
- EREN ÖZCEYLAN 24 author topics
- EMRE ÇEVİKCAN 23 author topics
- ÖMER FARUK YILMAZ 23 author topics
- CEYDA OĞUZ 22 author topics
- SÜLEYMAN METE 22 author topics
- YAKUP KARA 22 author topics