Skip to content
akaturk Academic measurement
Search

Article detail · 2022 · article

Estimating Construction Material Indices with ARIMA and Optimized NARNETs

ISSN1546-2218
YÖKSİS OpenAlex Open access · diamond
Year2022
Citations5OpenAlex
Percentile%72.8
FWCI0.761.00 = world average
Scopus (SJR)Q2
WoS (JCR)Q3

Data source split

  • YÖKSİSYÖKSİS article record
  • YÖKSİS venueCMC-Computers Materials & Continua
  • Catalog match (ISSN)Computers, Materials and Continua
  • OpenAlexOpenAlex enrichment (abstract, citations, topics)

Abstract

OpenAlex English

Construction Industry operates relying on various key economic indicators. One of these indicators is material prices. On the other hand, cost is a key concern in all operations of the construction industry. In the uncertain conditions, reliable cost forecasts become an important source of information. Material cost is one of the key components of the overall cost of construction. In addition, cost overrun is a common problem in the construction industry, where nine out of ten construction projects face cost overrun. In order to carry out a successful cost management strategy and prevent cost overruns, it is very important to find reliable methods for the estimation of construction material prices. Material prices have a time dependent nature. In order to increase the foreseeability of the costs of construction materials, this study focuses on estimation of construction material indices through time series analysis. Two different types of analysis are implemented for estimation of the future values of construction material indices. The first method implemented was Autoregressive Integrated Moving Average (ARIMA), which is known to be successful in estimation of time series having a linear nature. The second method implemented was Non-Linear Autoregressive Neural Network (NARNET) which is known to be successful in modeling and estimating of series with non-linear components. The results have shown that depending on the nature of the series, both these methods can successfully and accurately estimate the future values of the indices. In addition, we found out that Optimal NARNET architectures which provide better accuracy in estimation of the series can be identified/discovered as result of grid search on NARNET hyperparameters.

Topics

Citations

OpenAlex cited_by_count. Not a WoS or Scopus citation count; those sources have no separate column here.

5citationsOpenAlex · cited_by_count (cache / database)

1 publications in the local catalog that cite this work (OpenAlex reference match; not the full global list).

  1. 2025 Forecasting E-Waste Generation Using NARNETCitations 0 · OpenAlex

Authors

6
  1. ÜMİT IŞIKDAĞ 1
  2. AYCAN HEPSAĞ 2
  3. SÜREYYA İMRE BIYIKLI 3
  4. Derya Öz 4
  5. GEBRAİL BEKDAŞ İSTANBUL ÜNİVERSİTESİ-CERRAHPAŞA 5
  6. Zong Woo Geem 6