İçeriğe geç
akaturk Akademik ölçüm

Makale detayı · 2017 · article

Modeling information flow in the supply chain of structural steel components

Dergi Journal of Civil Engineering and Management
OpenAlex Açık erişim · gold
Yıl2017
Atıf13OpenAlex
Yüzdelik%83,5
FWCI1,321,00 = dünya ortalaması
Scopus (SJR)Q2
WoS (JCR)Q2

Veri kaynağı ayrımı

  • YÖKSİS dergi adıJournal of Civil Engineering and Management
  • OpenAlexOpenAlex zenginleştirmesi (özet, atıf, konular)
  • Semantic Scholaratıf sayısı (OpenAlex ile birleştirilmez)

Özet

OpenAlex İngilizce

Accessing the required information in the supply chain of structural steel components is critical for minimiz­ing costly reworks and delays. This paper identifies the information items generated in the different phases of the supply chain related to structural steel components and formalizes the process of producing and using this information. Precise details about different features of the components (e.g., their geometry and weight, connection details, cutting/bending/ punching requirements, and the type and grade of the material) are set in the various tasks performed in the different phases of the supply chain. Regardless of whether one uses paper-based systems or advanced technologies such as smart tags and radio-frequency identification (RFID), a better understanding is achieved of the processes through which a structural steel component passes. The results of this research can be used to streamline the information flow in the supply chain of structural steel components, regardless of the type of tracking technology used, hence reducing delays and reworks.

Konular

Atıflar

OpenAlex cited_by_count. WoS veya Scopus atıf sayısı değildir; o kaynaklar için ayrı kolon yoktur.

13atıfOpenAlex · cited_by_count (önbellek / veritabanı)

Yerel katalogda bu makaleye atıf yapan 6 yayın (OpenAlex referans eşleşmesi; tam dünya listesi değildir).

  1. 2021 Formalization of Occupant Feedback and Integration with BIM in Office BuildingsAtıf 21 · OpenAlex
  2. 2022 RATEWORKSPACE: BIM INTEGRATED POST-OCCUPANCY EVALUATION SYSTEM FOR OFFICE BUILDINGSAtıf 11 · OpenAlex
  3. 2022 Rateworkspace: BIM integrated post-occupancy evaluation system for office buildingsAtıf 11 · OpenAlex
  4. 2024 The contextual information requirements for collection and use of occupant feedback in BIM-enabled FMAtıf 3 · OpenAlex
  5. 2024 The contextual information requirements for collection and use of occupant feedback in BIM-enabled FMAtıf 3 · OpenAlex
  6. 2024 The contextual information requirements for collection and use of occupant feedback in BIM-enabled FMAtıf 3 · OpenAlex

Yazarlar

Yazar bilgisi yok.