İçeriğe geç
akaturk Akademik ölçüm

Akademisyen

MURAT ÇEVİKBAŞ

DOÇENT

ISPARTA UYGULAMALI BİLİMLER ÜNİVERSİTESİ TEKNOLOJİ FAKÜLTESİ İNŞAAT MÜHENDİSLİĞİ BÖLÜMÜ

  • Ana Dal Mühendislik Temel Alanı
  • Yan Dal İnşaat Mühendisliği

Kayıtlı çıktılara kısa bakış — ayrıntılar aşağıda.

  • Makale 24
  • Proje 0
  • Kitap 4
  • Bildiri 11
  • Patent 0
  • Sanatsal 0
Scopus (SJR) Q1 8 Q2 3 Q3 0 Q4 5
WoS (JCR) Q1 5 Q2 6 Q3 1 Q4 3
TR Index 9 makale

Alan+yıl+tür normalize OpenAlex yüzdelik — Clarivate ESI / SciVal değildir.

Üst %1 makale 0
Üst %10 makale 3
Ort. yüzdelik 62.6%
Üst %1 payı 0.0%
Üst %10 payı 12.5%

Makaleler

YÖKSİS ve OpenAlex kaynak ayrımıyla makaleler; quartile ve TR Index ile daraltabilirsiniz.

Dizin filtreleri

Toplam 24 yayın

Makale listesi

  1. 2026 Leadership, Personality, and Behavioral Characteristics of Senior Managers in Turkish Construction Firms: An Integrated Analysis Across Different Firm Sizes Buildings DOI 10.3390/buildings16153005 YÖKSİS SJR Q1 JCR Q2 OpenAlex 85.1%
  2. 2026 Analysis of Strength and Homogeneity of Different Concrete Specimens Prepared Under a High-Frequency and Low-Power Piezoelectric Excitation System Materials DOI 10.3390/ma19081600 YÖKSİS SJR Q2 JCR Q2 OpenAlex 29.9%
  3. 2025 Selection Framework of Disruption Analysis Methods for Megaprojects: An Integrated Fuzzy Multi-Criteria Decision-Making Approach Engineering, Construction and Architectural Management DOI 10.1108/ECAM-02-2023-0105 YÖKSİS SJR Q1 JCR Q1 OpenAlex 76.8%
  4. 2024 Identification and Assessment of Disruption Claim Management Risks in Construction Projects: A Life Cycle-based Approach Engineering, Construction and Architectural Management DOI 10.1108/ECAM-05-2022-0470 YÖKSİS SJR Q1 JCR Q1 OpenAlex üst %10 OpenAlex 93.2%
  5. 2024 Development of Delay and Disruption Cause Monitoring Framework for Megaprojects: A Claim Management Approach from the Contractor’s Perspective to Enhance Sustainability in the Built Environment Sustainability DOI 10.3390/su162410856 YÖKSİS SJR Q1 JCR Q2 OpenAlex 89.1%
  6. 2023 Identification of the Precautions to Minimize the Occurrence of Disputes Leading to Litigation: Evidence from Turkish Construction Industry KSCE Journal of Civil Engineering DOI 10.1007/s12205-023-2208-0 YÖKSİS SJR Q2 JCR Q2 OpenAlex 80.0%
  7. 2023 Determination of the Most Appropriate Alternative Dispute Resolution Methods for Airport Projects: A Fuzzy VIKOR Approach KSCE Journal of Civil Engineering DOI 10.1007/s12205-023-1864-4 YÖKSİS SJR Q2 JCR Q2 OpenAlex 76.5%
  8. 2023 Detecting the most appropriate delay analysis methods for mega airport projects Engineering, Construction and Architectural Management DOI 10.1108/ECAM-12-2021-1107 YÖKSİS SJR Q1 JCR Q1 OpenAlex 71.1%
  9. 2023 Severity Assessment of Problems in Turkish Building Audit System: A Fuzzy AHP Approach Teknik Dergi DOI 10.18400/tjce.1209174 YÖKSİS TR Index SJR Q4 JCR Q4 OpenAlex 66.3%
  10. 2023 Identification of Dispute Sources in the Construction Industry via Court Files Teknik Dergi DOI 10.18400/tjce.1224425 YÖKSİS TR Index SJR Q4 JCR Q4 OpenAlex 76.4%
  11. 2023 Determination of Significance of 4D-BIM Features SDU Journal of Natural and Applied Sciences DOI 10.19113/sdufenbed.1209834 YÖKSİS TR Index OpenAlex 47.3%
  12. 2022 Alternative Dispute Resolution Selection Framework to Settle Disputes in Public-Private Partnership (PPP) Projects Journal of Construction Engineering and Management DOI 10.1061/(ASCE)CO.1943-7862.0002351 YÖKSİS SJR Q1 JCR Q1 OpenAlex üst %10 OpenAlex 93.9%
  13. 2022 New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects Journal of Construction Engineering and Management DOI 10.1061/(ASCE)CO.1943-7862.0002394 YÖKSİS SJR Q1 JCR Q1 OpenAlex 89.2%
  14. 2022 Determining the Effect of Level of Floor, External Wall Thickness and Jacketing on Acoustic Comfort in Existing Residential Buildings in Turkey Mühendislik Bilimleri ve Tasarım Dergisi DOI 10.21923/jesd.1072817 YÖKSİS TR Index OpenAlex 9.4%
  15. 2022 Determining the Factors Affecting the Productivity in Construction Projects Dicle Üniversitesi Mühendislik Fakültesi Mühendislik Dergisi DOI 10.24012/dumf.1074842 YÖKSİS TR Index OpenAlex 12.4%
  16. 2021 An Overarching Review on Delay Analyses in Construction Projects Buildings DOI 10.3390/buildings11030109 YÖKSİS SJR Q1 JCR Q2 OpenAlex üst %10 OpenAlex 98.2%
  17. 2021 Genleştirilmiş Cam Agregalı Harçlarda Alkali Silika Reaksiyonu (ASR) Fırat Üniversitesi Mühendislik Bilimleri Dergisi DOI 10.35234/fumbd.891477 YÖKSİS TR Index OpenAlex 12.9%
  18. 2021 Genleştirilmiş Cam Agregalı ve Genleştirilmiş Perlit Agregalı Şap Harçlarının Performans Özelliklerinin Belirlenmesi El-Cezeri Fen ve Mühendislik Dergisi DOI 10.31202/ecjse.753475 YÖKSİS TR Index SJR Q4 OpenAlex 55.1%
  19. 2021 Genleştirilmiş Cam Agrega ve Genleştirilmiş Perlit Agrega İkameli Üretilen Şap Betonlarının Fiziksel Özelliklerinin Araştırılması Teknik Bilimler Dergisi DOI 10.35354/tbed.918849 YÖKSİS OpenAlex 54.3%
  20. 2019 Evaluation of Litigation Process in Turkish Construction Industry from the Perspective of Judicial Actors Tamap Journal of Engineering DOI 10.29371/2019.3.76 YÖKSİS OpenAlex 84.8%

Akademisyenlere dön