Akademisyen
GÜL POLAT TATAR
PROFESÖR
İSTANBUL TEKNİK ÜNİVERSİTESİ İNŞAAT FAKÜLTESİ İNŞAAT MÜHENDİSLİĞİ BÖLÜMÜ
- Ana Dal Mühendislik Temel Alanı
- Yan Dal İnşaat Mühendisliği
Kayıtlı çıktılara kısa bakış — ayrıntılar aşağıda.
- Makale 49
- Proje 0
- Kitap 3
- Bildiri 51
- Patent 0
- Sanatsal 0
Scopus (SJR)
Q1
29
Q2
6
Q3
7
Q4
0
WoS (JCR)
Q1
14
Q2
14
Q3
9
Q4
5
TR Index
2
makale
Makaleler
YÖKSİS ve OpenAlex kaynak ayrımıyla makaleler; quartile ve TR Index ile daraltabilirsiniz.
Makale listesi
- 2026 Evaluating Interactions between Formwork System Selection Criteria for Building Construction Projects: A Rough DEMATEL Approach YÖKSİS SJR Q1 JCR Q1
- 2026 Identification and classification of risks in construction projects: clusters, trend studies and risk breakdown structure YÖKSİS SJR Q1 JCR Q1
- 2026 The group analytic hierarchy process (G-AHP) with preference aggregation by type-2 fuzzy envelope of extended hesitant fuzzy linguistic term set (EHFLTS) YÖKSİS SJR Q2 JCR Q3
- 2025 Subcontractor Selection for a Construction Project: Optimal Plan YÖKSİS SJR Q1 JCR Q1
- 2025 Risk-based completion cost prediction approach in construction projects utilizing machine learning YÖKSİS SJR Q1 JCR Q2
- 2025 Interdisciplinary Pathways for Innovation in Construction and Management YÖKSİS SJR Q3
- 2025 Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects YÖKSİS SJR Q1 JCR Q2
- 2025 Selecting the market for an international construction enterprise YÖKSİS SJR Q3 JCR Q4
- 2024 Augmented Time–Cost Trade-Off Optimization Using Particle Swarm Optimization YÖKSİS SJR Q1 JCR Q1
- 2024 Risk-Based Completion Cost Overrun Ratio Estimation in Construction Projects Using Machine Learning Classification Algorithms: A Case Study YÖKSİS SJR Q1 JCR Q2
- 2024 A Performance-Based Subcontractor Selection Model YÖKSİS SJR Q1 JCR Q1
- 2024 An integrative literature review on the causes of delays in construction projects: evidence from developing countries YÖKSİS SJR Q1 JCR Q2
- 2024 Application of Construction 4.0 Technologies: Empirical Findings from the Turkish Construction Industry YÖKSİS SJR Q1 JCR Q1
- 2023 Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects YÖKSİS SJR Q1 JCR Q1
- 2023 Agregacja ocen decydentów dla systemu predykcji czasów realizacji procesów budowlanych YÖKSİS
- 2023 Crashing construction projects considering schedule flexibility: an illustrative example YÖKSİS SJR Q1 JCR Q1
- 2023 A crashing-based time-cost trade-off model considering quality cost and contract clauses YÖKSİS SJR Q1 JCR Q1
- 2022 Formwork systems selection criteria for building construction projects: a critical review of the literature YÖKSİS SJR Q3 JCR Q4
- 2022 Formwork System Selection Criteria for Building Construction Projects: A Structural Equation Modelling Approach YÖKSİS SJR Q1 JCR Q2
- 2022 Formwork System Selection in Building Construction Projects Using an Integrated Rough AHP-EDAS Approach: A Case Study YÖKSİS SJR Q1 JCR Q2