İçeriğe geç
akaturk Akademik ölçüm

Makale detayı · 2013 · article

Planing of small hydropower plants and Kezer river

Dergi European Science Journal
ISSN1857-7881
YÖKSİS OpenAlex Açık erişim · green
Yıl2013
Atıf0OpenAlex
Yüzdelik%6,1
FWCI0,01,00 = dünya ortalaması

Veri kaynağı ayrımı

  • YÖKSİSYÖKSİS makale kaydı
  • YÖKSİS dergi adıEuropean Science Journal
  • OpenAlexOpenAlex zenginleştirmesi (özet, atıf, konular)

Özet

OpenAlex İngilizce

Investments of Hydroelectric Power Plants have been grown up and our country has become like a construction site by entering into force of the law concerning the transfer of the right of water use in Turkey since 2001. Turkey has a gross annual hydropotential of 433.000 GWh, which is almost 1% of world total potential. Its share is about 16% of the total hydropower capacity in Europe. This situation has increased the importance of planning and arousing interest of academic levels of hydroelectric power plant (HEP) and small hydropower plant (SHEP). Small-scale micro hydropower is both an efficient and reliable form of energy. The first small hydroelectric plant (SHEP) with a capacity of 88 kW was installed in Turkey in 1902. In this study, a concrete example of a not accumulated hydroelectric facility planning is discussed by aiming of consideration of Kezer River in Turkey hydroelectric energy potential. Finally Installed power and energy values of the total annual flow have been calculated using discharge, net head and turbine efficiency.

Konular

Atıflar

OpenAlex cited_by_count. WoS veya Scopus atıf sayısı değildir; o kaynaklar için ayrı kolon yoktur.

0atıfOpenAlex · cited_by_count (önbellek / veritabanı)

Yazarlar

3
  1. ONEN FEVZİ 1
  2. EMİNOGLU MAHMUT 2
  3. FEVZİ ÖNEN DİCLE ÜNİVERSİTESİ 3