Makale detayı · 2019 · article
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
ISSN1226-7988
YÖKSİS
OpenAlex
Üst %10
Yıl2019
Atıf118OpenAlex
Atıf9Semantic Scholar · 1 etkili
Yüzdelik%96,2
FWCI5,791,00 = dünya ortalaması
Scopus (SJR)Q2
WoS (JCR)Q3
Veri kaynağı ayrımı
- YÖKSİSYÖKSİS makale kaydı
- YÖKSİS dergi adıKSCE Journal of Civil Engineering
- Katalog eşleşmesi (ISSN)KSCE Journal of Civil Engineering
- OpenAlexOpenAlex zenginleştirmesi (özet, atıf, konular)
- Semantic Scholaratıf sayısı (OpenAlex ile birleştirilmez)
Özet
Özet henüz derlenmedi; DergiPark / OpenAlex kuyruğu işlenince burada görünecek.
Konular
Atıflar
OpenAlex cited_by_count. WoS veya Scopus atıf sayısı değildir; o kaynaklar için ayrı kolon yoktur.
118atıfOpenAlex · cited_by_count (önbellek / veritabanı)
Yerel katalogda bu makaleye atıf yapan 22 yayın (OpenAlex referans eşleşmesi; tam dünya listesi değildir).
- 2023 Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithmsAtıf 53 · OpenAlex
- 2023 Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithmsAtıf 53 · OpenAlex
- 2023 Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithmsAtıf 53 · OpenAlex
- 2023 Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projectsAtıf 52 · OpenAlex
- 2023 Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projectsAtıf 52 · OpenAlex
- 2023 Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projectsAtıf 52 · OpenAlex
- 2023 A novel oppositional teaching learning strategy based on the golden ratio to solve the Time-Cost-Environmental impact Trade-Off optimization problemsAtıf 50 · OpenAlex
- 2024 A dual opposition learning-based multi-objective Aquila Optimizer for trading-off time-cost-quality-CO2 emissions of generalized construction projectsAtıf 25 · OpenAlex
- 2018 A multi-objective improved teaching learning based optimization algorithm for time-cost trade-off problemsAtıf 14 · OpenAlex
- 2024 Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problemAtıf 12 · OpenAlex